Preventative maintenance is key! Last month we completed this self storage building in Albany, NY. Their 6 year old EPDM was not up to warranty standards so we stripped off 5,000 linear feet of seams and reinstalled 3,000 SQFT of wall flashing.
Project: GTI Location: 28 Appleton Street. Holyoke, MA Completed in 2019 Details: 2 later built up tear off. 48,750 SQFT part concrete deck with tongue and grove decking. 060 carlisle reinforced EPDM because of heavy foot traffic.
Project: UHAULLocation: West Springfield, MACompleted: 2019Details: 26,500 SQFT roof. Metal retrofit system with an engineered roof hugger system and r30 batten insulation underneath the new 20ga MBCI mechanical lock panel. Custom new metal gutters/downspouts and snow...
140 Rye Street in South Windsor, CT was a 2 layer built up rip. Over 20,000 SQFT of rotted steel decking. Overall roof size was 109,000 SQFT carlisle 060 grey TPO rhinobond replacement. We completed this one last year.
Project: Nomads/United Technology Fuel Cell Division in South Windsor, CT.Details: This was a 2 layer built up rip job. 102,000 SQFTManufacturer: 060 Firestone TPO replacement. Completed in 2019.