What’s a better area to do a job than in “green mountain state?”
The front part of this building was just completed in the beginning of July.
Springfield Technology Center – Springfield, VT
44,000 SQFT Replacement
Roof Details:
Ballast Removal
Full EPDM tear off down to the Deck.
Cav Grip the entire Concrete Deck surface
[2] layers of 2.6″ insulation set in low rise foam
Fully Adhered Carlisle .060 TPO membrane.
New ES-1 Edge metal
Job Duration-5 Days start to finish.