Planet Fitness – Dollar Tree Plaza – Springfield,MA
Job Details-
58,000 SQFT Replacement
Adler Commerical Vacuum did a complete Ballast Removal.
EPDM Removed down to the existing insulation. [1] layer of 1.5″ insulation over the existing insulation
1 ply of .060 Carlisle Rhinobond TPO membrane. New custom Throughwall TPO clad chutes with New collector boxes and 3″*4″ downspouts.