We want to thank this company for believing in us not to just protect all the contractors from the previous safety upgrade we installed three years ago on September 9th of 2020 but for calling us back to do this amazing project our crew completed this week. Look back at our post from 9/3/20

KIK
Ludlow, MA
24,500 SQFT Replacement

Roof Details –
Metal flute filler with EPS insulation. New 1” insulation over the flute filler. Rhinobond Durolast PVC 60 Mill Membrane. New seamless 7” gutter with 3”by 4” downspouts.