This job took Tech roofing over two long years to complete due to multi-phase GC contractor demo. It was a complete 180 flip from what this building originally looked like.
-Horst Engineering
-East Hartford, CT
-160,000 Sq ft 2 layer complete modified built up rip. Over 500 sheets of 20 ga steel decking replacement with cross screwing all steeling decking at side laps. 2 layers of 2.2″ iso with a 1/16″ per foot taper package. Carlisle 060 Rhinobond with custom fab snap metal.