This building was one of the harder buildings to show the amazing quality of work we strive for each and everyday because of how beautifully white this building came out.
Job details –
Bio-Lab/Medical Labs – Norwood, MA
2 Technology Way
Job Details-
81,000 SQFT
(2) layer Tear off down to the Steel Deck. (2) layers of 2.6” insulation with a 1/2” HD coverboard. Sarnafil S327 RhinoBond membrane. Custom (4) piece snap metal with fascia extension.